VORAFIREArchitectural fire Request a project
Menu

Installation and specifications

Plan the detail before construction begins.

Every project is reviewed around placement, access, water, power, ventilation, and finished opening conditions.

A coordinated installation path

  1. Share room photos, plans, intended viewing style, and desired overall length.
  2. Confirm the product configuration, water option, electrical service, and access strategy.
  3. Review the project-specific opening and clearance information before fabrication.
  4. Keep service panels and replaceable modules accessible after the finish work is complete.
Project-specific dimensions required

Reference diagrams are conceptual. Final cutout, clearance, electrical, water, and ventilation requirements must be confirmed for the selected configuration before construction.

Request installation guidance